New construction of 3 apartment blocks with underground car park

Due to the geological situation encountered during the construction of the new apartment block St. Georg 5-9 in Ruhpolding, which was built in two construction phases, a watertight construction pit shoring was required for the second construction phase. The shoring was designed as a closed, sealed sheet pile box. The shoring was a temporary excavation support measure with a shoring area of 1,388 square metres and a cofferdam construction in the area of the crane location.

Service:

  • Approval planning LPH4 – Shoring and foundation
  • Execution planning LPH5 – Shoring and foundation

Info

Client:

Kath. Siedlungswerk München GmbH

Adolf-Kolping-Straße 4

80336 Munich

Realisation:

Franz Kassecker GmbH

Egerer Straße 36

96652 Waldsassen

Execution period:

Summer 2023

Project details:

1388m² sealed, closed sheet pile wall box

10 tie rods for cofferdam construction